{"id":784,"date":"2026-08-27T15:34:37","date_gmt":"2026-08-27T15:34:37","guid":{"rendered":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/?post_type=project&#038;p=784"},"modified":"2026-09-03T10:07:59","modified_gmt":"2026-09-03T10:07:59","slug":"technical-and-managerial-support-for-strengthening-2","status":"publish","type":"project","link":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/our-work\/healthy-lives-better-futures\/technical-and-managerial-support-for-strengthening-2","title":{"rendered":"Technical and Managerial Support for Strengthening the Monitoring and Evaluation (M&amp;E) system and for Conducting an Impact Evaluation of the One WASH National Program (OWNP)"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>The project supported Ethiopia&#8217;s One WaSH National Programme (OWNP) to strengthen accountability by operationalising the Water, Sanitation and Hygiene (WaSH) monitoring and evaluation (M&#038;E) system at the federal, regional, and woreda levels.<\/p>\n<p>The assignment enabled the generation of reliable, timely, and evidence-based information to improve sector planning and decision-making.<\/p>\n","protected":false},"author":1,"featured_media":727,"template":"","meta":{"_acf_changed":true,"inline_featured_image":false},"project_geography":[37],"project-partner":[248,72],"project-year":[35,36],"thematic-priority":[28,59],"class_list":["post-784","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/project\/784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/users\/1"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/media\/727"}],"wp:attachment":[{"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/media?parent=784"}],"wp:term":[{"taxonomy":"project_geography","embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/project_geography?post=784"},{"taxonomy":"project-partner","embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/project-partner?post=784"},{"taxonomy":"project-year","embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/project-year?post=784"},{"taxonomy":"thematic-priority","embeddable":true,"href":"https:\/\/beta.studiobrahma.in\/ipe-africa-dyn\/wp-json\/wp\/v2\/thematic-priority?post=784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}